Construction of the main system of sewage sanitation and electrical infrastructure and water from the city of Posadas.
Misiones - Argentina
Building sewer system of the city of Posadas and Construction of Concrete Bridge/Arroyo Mártires. Rock excavation in urban area with explosives: 6,121 m3. Total excavation: 89,000 m3. Concrete p/structures: 4,249 m3. Lift stations: 5 Hydraulic capacity: Pumping station No. 5: 0,651 m3/s. Pumping station No. 6: 1,085 m3/s. Population served 250,000 inhabitants. Submersible pumps: 23 Installed power: 3.000 KVA. Tended line of medium voltage: 33 Kw - Approx. length: 800 m. 13.2 Kw - Length 3,700 meters. Concrete posts w/60 m.