Construction of Aqueduct Centro Oeste.
Santa Fe - Argentina
Excavation p / foundations: 325,000 m3. Soil Filling: 244,900 m3. Concrete: p/Elem. Precast: 854 m3. Concrete Structures: 8,560 m3. Potable Water Plant Treatment Capacity: 242 I/sec. Intake Work, Reinforced Concrete (RC) Viaduct 250 m of length and loading Chamber. Construction of 17-tanks: from 500 to 5,000 m3. 4 pumping stations. Supply and installation of 19 bombs. Hydraulic capacity: Lifting Station Intake work 0.26 m3/s. Lifting Station, output plant: 0,242 m3/s. 4 Dump Tanks. GRP Pipes: Ø 500 mm: Ø 33.390 m. Ø 450 mm: Ø 45.000 m. Ø 315 mm: Ø 49.615 m. PVC Plumbing class 6: Ø250 mm: 50.250 m. Ø200 mm: 4.450 m. Ø160 mm: 51.860 m. Reducing valves, drains, air and pressure sustaining valves: 370 pcs. Casing Ø Variables 610/305 mm for crossing roads, railways, canals and streams: 1180 meters and laying of 25 km of medium voltage line. SCADA control system.